Grid successfully completed soil Transportation and Disposal for the 595 Dean Street Project, which consisted of Hazardous, Non-Hazardous, and Uncontaminated native materials. Grid’s proprietary software allowed it to optimize and streamline the facility review and approval process, so that Grid was able to obtain multiple approvals at various disposal facilities. Using this approach, Grid was able to maintain consistent production for excavation at the site, setting a new company record of 252 loads (~7000 tons) removed in a single day.